cleaning time sheet

30/9

Hi team, this is the cleanup sheet that I've created.
Please correct me if anything needs to be changed thank you :)

Friday, 19 September 2014

Runsheet 1.0

The first attempt at the run sheet, I tried to take into consideration numerous things including:
-Technical Requirements of each stall
-Whether or not they were building their own structure
-Estimated time it may take for each particular stall to set-up
-How much stuff they will be brining in
-Will there stuff be in storage
-How long will it take for construction to set up the base

I just kept adding sheet after sheet to my wall, nearly running out of wall space. And adding post-it notes with questions as I thought of them 




Technical/Facility Requirements

Here is the first run sheet we have managed to come up with:

The original thoughts behind this is that construction will build the top half first while teams with their own structures work along side construction. Once construction has completed the first half teams can start setting up their stall and construction will move on to the second half. Ideally no teams will be working next to each other at the same time. All teams requiring technical assistance will all be in by a certain time and we will ensure that the technical team is there at these times.

Problems may be caused with construction having to work around maker teams.
Stage Construction? Who's doing this, will it need to be early as it is bug?









Wednesday, 10 September 2014

Week 7 Presentation

So all the facilitators and makers did presentation in paramount theatre.
We have been trying to catch up people to fill out the blank spaces.
We have been looking at wearing different coloured hi vest as a logistic group so people could know who we are and find us if they need any help.

Wednesday, 3 September 2014

Filling out Google master sheet

Hey guys hope you guys are having a good rest
Just a question I don't have all the info for the other groups
but I could fill out the blank spaces based on Luke's note.
(Emma has the other half written in her book)
----
I've filled out some of the spaces.. because i haven't got all the information.
Just a question.
On Luke's note(one which is not in excel format) it said
Group 47 is doing zine and
group 56 is doing pallet lounge
but on excel it was already saved as
Group 56 is doing zine and
group 47 didn't have their info written but their team name was saved as TM(M)NT