Meeting with the Governance Groups, this included...
Told everyone where we were at
Decisions were made regarding ....
Were given the first look at the layout
Made a plan of what we have to do from now
Showing posts with label Wk 8. Show all posts
Showing posts with label Wk 8. Show all posts
Tuesday, 23 September 2014
Saturday, 20 September 2014
Run Sheet (so far)
The Google Doc Run Sheet (so far),
Still need to get information from a lot of groups. This will be done on wednesday.
Link to Run sheet: https://docs.google.com/spreadsheets/d/1_akcOoaeIf3RXBG79Q_SnC62AYVb3C5GsAoFWzmn3S0/edit#gid=0
Ben Murdoch.
Still need to get information from a lot of groups. This will be done on wednesday.
Link to Run sheet: https://docs.google.com/spreadsheets/d/1_akcOoaeIf3RXBG79Q_SnC62AYVb3C5GsAoFWzmn3S0/edit#gid=0
Ben Murdoch.
Friday, 19 September 2014
Runsheet 1.0
The first attempt at the run sheet, I tried to take into consideration numerous things including:
-Technical Requirements of each stall
-Whether or not they were building their own structure
-Estimated time it may take for each particular stall to set-up
-How much stuff they will be brining in
-Will there stuff be in storage
-How long will it take for construction to set up the base
I just kept adding sheet after sheet to my wall, nearly running out of wall space. And adding post-it notes with questions as I thought of them
![]() |
| Technical/Facility Requirements |
Here is the first run sheet we have managed to come up with:
The original thoughts behind this is that construction will build the top half first while teams with their own structures work along side construction. Once construction has completed the first half teams can start setting up their stall and construction will move on to the second half. Ideally no teams will be working next to each other at the same time. All teams requiring technical assistance will all be in by a certain time and we will ensure that the technical team is there at these times.
Problems may be caused with construction having to work around maker teams.
Stage Construction? Who's doing this, will it need to be early as it is bug?
Wednesday, 17 September 2014
Meeting up with other groups
We decided that we don`t really need a uniform as a logistic group.
We talked to Logistic storage group which is group 18 and figured out what space we can use and what not.
and we talked to event designs group as well about whole plan of layout.
Thing that we have to make will be run sheet before wednesday class.
Emma will be posting up details cheers.
We talked to Logistic storage group which is group 18 and figured out what space we can use and what not.
and we talked to event designs group as well about whole plan of layout.
Thing that we have to make will be run sheet before wednesday class.
Emma will be posting up details cheers.
Uniform concern (Fuse Facebook Group)
So i have been talking about uniforms and realised group 3 are wearing hi vest as well.
We should probably talk to them on Wednesday and see what is going on
+ I realised some of them doesnt really like the idea of different coloured hi vest. Any other ideas on our uniform?