Friday, 19 September 2014

Runsheet 1.0

The first attempt at the run sheet, I tried to take into consideration numerous things including:
-Technical Requirements of each stall
-Whether or not they were building their own structure
-Estimated time it may take for each particular stall to set-up
-How much stuff they will be brining in
-Will there stuff be in storage
-How long will it take for construction to set up the base

I just kept adding sheet after sheet to my wall, nearly running out of wall space. And adding post-it notes with questions as I thought of them 




Technical/Facility Requirements

Here is the first run sheet we have managed to come up with:

The original thoughts behind this is that construction will build the top half first while teams with their own structures work along side construction. Once construction has completed the first half teams can start setting up their stall and construction will move on to the second half. Ideally no teams will be working next to each other at the same time. All teams requiring technical assistance will all be in by a certain time and we will ensure that the technical team is there at these times.

Problems may be caused with construction having to work around maker teams.
Stage Construction? Who's doing this, will it need to be early as it is bug?









No comments:

Post a Comment